01Aerospace02Heavy Engineering03Home Improvements04Medical Devices05Battery & Semiconductor06Data Centers & Control Systems
18.4 million experienced workers leave manufacturing by 2032. Their judgement shouldn't leave with them.
Every sector inspects different parts, but the pressure is the same: fewer skilled inspectors, rising rework and warranty cost, and inspection data that never leaves the station. Loopr captures that judgement in Vision AI and applies it to every unit.
Find your industry
Request Demo
←
Aerospace
Aerospace
Heavy Engineering
Heavy Engineering
Home Improvements
Home Improvements
Medical Devices
Battery & Semiconductor
Battery & Semiconductor
Data Centers & Control Systems
→
01
Aerospace
02
Heavy Engineering
03
Home Improvements
04
Medical Devices
05
Battery & Semiconductor
06
Data Centers & Control Systems
01
Aerospace & defense
Aerospace
2.5 hrs
Manual galley sealant check replaced by in-line Vision AI.
Airframe assembly
The problem
An airframe carries thousands of fasteners, metres of sealant and whole composite skins, most still judged by eye and signed off with a paper stamp. A missed junction shows up at leak test or in service, and pulling AS9100 records for one serial number takes days.
Composite delamination, wrinkles and porosity
Scrap −15–60%
Fasteners verified by a second set of eyes
Escapes −20–30%
AS9100 evidence locked on paper travelers
Audits: days → minutes
02
Trucks & commercial vehicles
Heavy Engineering
$5M+
First-year savings at a large truck manufacturer. Rework down 11%, scrap down 15%.
Frame paint line
The problem
Every unit is built to its own BOM, so a missing bracket or wrong kit is easy to miss on the line and expensive to find at the dealer. Welds and paint are spot-checked by hand, and warranty claims can't be traced back to what was inspected.
Wrong kit at the station, wrong build downstream
Rework −10–20%
Welds spot-checked, misses reach final assembly
Inspection time −20–40%
No per-unit record behind a warranty claim
Audits: days → minutes
03
Windows, doors & building products
Home Improvements
1 → 25+
A leading window manufacturer is expanding Vision AI assembly verification from one line to more than 25.
Module assembly
The problem
Cosmetic rejects drive the reject rate, and the call changes with the inspector. Finish mismatches and sealant gaps leave the plant unnoticed and come back as callbacks from the job site, sometimes years later.
Scratch, crack and dent calls vary by inspector
Scrap −15–60%
Panels that don't match once installed
Rework −10–20%
Customer packets built by hand per serial
Escapes −20–30%
04
Devices & life sciences
Medical Devices
Days → min
Per-unit inspection evidence ready for ISO13485 and 21 CFR Part 11 audits.
Cleanroom assembly
The problem
A reversed seal or a missing O-ring is a recall, not arework. Bond-line gaps are invisible once the deviceis closed, particulate is found at final inspection if itis found at all, and one unit's record takes days toassemble for an auditor.
Reversed or missing components
Escapes −20–30%
Bond-line gaps hidden after assembly
Rework −10–20%
Cleanroom particulate found too late
Scrap −15–60%
05
Cells, modules & electrical assemblies
Battery & Semiconductor
15 → 60
Micro-weld inspection throughput after Loopr was added to the existing microscope.
Module assembly
The problem
Safety-critical assemblies where one missed component becomes a field failure. Termination errors only show up under load, micro-welds are checked under a microscope until the inspector's eyes tire, and per-serial documentation is assembled by hand at ship time.
Termination errors that appear after commissioning
Rework −10–20%
Micro-weld inspection limited by operator fatigue
Inspection time −20–40%
Customer packets built by hand per serial
Audits: days → minutes
06
Racks, switchgear & control panels
Data Centers & Control Systems
100%
Of racks and panels checked against their own build spec, not a sample.
Rack integration
The problem
Racks, switchgear and control panels are built to customer-specific drawings. Wiring, terminations and labels are checked by eye against paper travellers, and a fault found at commissioning has no record of what was inspected.
Every unit built to its own drawing
Wiring errors caught at the bench
Manual FAT walkdowns
Faster factory acceptance tests
No record behind commissioning faults
Audits: days → minutes

Start Your Quality Solution

Whether you're deep into a failed audit, an ERP/MES upgrade, or just tired of being told to “do something with AI,” the real first step is the same: structure the data. Let's talk about what that looks like on your floor.